numbered 7 to 10 (Southern Railway nos
To make sure there is a version for every need
The train cost £3 million and took only nine months from concept to completion
and you are running out of connectors
all but one of the original units remain in traffic to this day
2436 BR(S) Green MK2 First Corridor (FK) Passenger Coach Class-60 numbered 7 to 10 (SouthernBuilt between 1964 and 1975, the MK2 coaches were one of the highest number of coaches built for British Railways. These coaches were used all over the country by lots of different operators including Scot Rail, Network SouthEast, BR and even Network Rail. Seven different classes of coach were made using the MK2 design (MK2, MK2A, MK2B, MK2C, MK2D, MK2E and MK2F), each with their own unique characteristics and additions to the original design. Other